Direct procurement of every component a Voxiss-designed system requires — controllers, amplifiers, loudspeakers, microphones, network infrastructure, cabling, and ancillaries — sourced through our manufacturer relationships and warehoused for project deployment.

Every item is inspected on receipt, tagged to its project, and held in our facility until installation. Where the project demands accelerated delivery, our supply-chain relationships allow us to expedite shipping from European manufacturing partners directly into the UK or Ireland.

Manufacturer: Ambient System EU
Inspection: Goods-In Quality Check
Lead Time: Standard 4–6 weeks · Expedited 1–3 weeks
Certification: CE / UKCA Documented
Scope

What We Supply

01
VA Control Equipment

EN 54-16 certified VACIE racks, IP-amplifiers, redundant controllers, and all associated power supply equipment certified to EN 54-4.

02
Loudspeakers

Full EN 54-24 loudspeaker range — ceiling, surface-mount, projector and column line-array variants — for every typical environment.

03
Microphones & Consoles

Fireman’s microphones, paging consoles, SIP dispatcher consoles, and all extension keypads — programmed for the project before dispatch.

04
Network & SIP

Managed switches, fibre transceivers, SIP gateways, and ABT VES gateways for IP-based or hybrid PA architectures.

05
Cabling & Ancillaries

Fire-rated FP200 / Mineral Insulated cable, structured network cabling, conduit, terminations, fixings, and labels — supplied to the project specification.

06
CIS Displays & Hearing Loops

Passenger information displays, induction-loop systems, and accessibility equipment compliant with the Equality Act 2010.

How We Work

Procurement Process

Stage 1
Procurement Process

BoM derived directly from the design package, with manufacturer part numbers, quantities, and certification references locked in before procurement.

Stage 2
Order & Track

Direct ordering with manufacturer partners, with shipment tracking and a clear delivery schedule reported back to the client at each milestone.

Stage 3
Goods-In Inspection

Every delivery inspected against the BoM, with serial numbers logged, certifications filed, and any damage or shortage raised with the supplier same-day.

Stage 4
Project Allocation

Equipment tagged to the project, held in secure stores, and released on call-off to either our fabrication facility or directly to site.