Service 07

Maintenance

Planned preventive maintenance keeps voice alarm systems compliant, reliable, and ready — meeting the BS 5839-8 recommendation for routine attention by the user, and the periodic inspection and servicing carried out by competent persons.

Voxiss offers tiered maintenance contracts to match the criticality and operating profile of your installation — from annual inspection-and-test programmes through to fully-managed 24/7 cover with guaranteed response times.

Compliance: BS 5839-8 Annex E
Frequency: Quarterly · Bi-annual · Annual
Coverage: Any Manufacturer · Any Age
SLA: 4h / 8h / 24h Response Tiers
Contract Options

Maintenance Tiers

Tier 1

Essential

Annual preventive maintenance visit aligned with BS 5839-8 recommendations. Minimum cover for buildings with low-criticality occupancy.

  • Annual full system inspection
  • Functional test of every zone and message
  • Battery condition test
  • Service report and recommendations
  • 24h reactive call-out response
Tier 2 · Recommended

Standard

Bi-annual preventive maintenance — the appropriate level for most commercial, retail, and education buildings under BS 5839-8.

  • Two preventive visits per year
  • Functional test of every zone and message
  • STIPA spot-check survey annually
  • Battery capacity test annually
  • Firmware and configuration backup
  • 8h reactive call-out response
Tier 3

Premium

Quarterly preventive maintenance with rapid 24/7 reactive cover. For high-criticality estates — transport, healthcare, courts, and infrastructure.

  • Four preventive visits per year
  • Quarterly functional and battery testing
  • Annual STIPA full survey
  • Remote monitoring & alerting (where supported)
  • Configuration baseline management
  • 4h 24/7 reactive call-out SLA
Per-Visit Scope

What a Visit Covers

01
Visual & Mechanical

Inspection of every accessible loudspeaker, microphone position, rack, cable termination, and emergency-message device for damage, dust, and security.

02
Functional Tests

Every evacuation message broadcast to every zone, every microphone activated, every fault input simulated — matched against the cause-and-effect matrix.

03
Battery & PSU

Battery terminal voltage, charger output, internal-resistance trend, and discharge test against EN 54-4 standby-capacity calculation.

04
Configuration Audit

Verification that the system configuration still matches the as-built baseline. Any unauthorised changes flagged and rolled back where appropriate.

05
Software & Firmware

Manufacturer-released firmware updates assessed and applied where appropriate, with full backup of configuration before and after.

06
Service Report

Visit report logged in the building log book and issued to the responsible person — with a clear action list of any remedial work or end-of-life equipment.